8688 x 5792 px | 73,6 x 49 cm | 29 x 19,3 inches | 300dpi
Aufnahmedatum:
19. Dezember 2015
Ort:
Neurath, Grevenbroich, NRW, Northrhine Westphalia, Germany, Europe
Weitere Informationen:
Wikipedia: The Neurath Power Station serves mainly as a base load power station. It consists of seven units (3 x 300 MW, 2 x 600 MW, and 2 x 1, 100 MW nominally). Five older units were built between 1972 and 1976, and have a gross generation capacity of 2, 200 MW. On 15 August 2012 two new 1, 100 MW lignite-fired units – F and G, also known as BoA 2 and 3 – were added. BoA stands for Braunkohlekraftwerk mit optimierter Anlagentechnik (Lignite power station with optimized systems technology). The new units have an efficiency of 43% and the capability to adjust quickly to changes in energy demand. Its engineering was carried out by Alstom, which was also the supplier of the steam turbines. The consortium that supplied steam generators was led by Babcock-Hitachi Europe GmbH. GEA Group built the cooling towers. Construction costs were €2.6 billion. The lignite is delivered by rail from open pits in Rhenish lignite district, in particular from the Garzweiler and Hambach mines.